| Completed Contracts |
| LODUMLU BUILDING PROJECT | ANKARA-2006 | YAPIKREDİ - KORAY JV |
| Mechanical Services |
|
|
| SIDDIKLI SCHOOL BUILDING | KIRŞEHİR-2006 | ULAŞ CONSTRUCTION |
| Mechanical Services |
|
|
| TÜRKKONUT 2 MERKEZ MOSQUE | ANKARA-2006 | TERMO LTD. |
| Under floor Heating |
|
|
| HOTEL DELTA | ANKARA-2005 | DELTA İNŞAAT |
| Mechanical Consultancy |
|
|
| CASA PLANE HANGAR | ANKARA-2005 | DELTA İNŞAAT |
| Fire Suppression System with foaming Installation |
|
|
| ANKAMALL TRADE CENTER, OFFICES and HOTEL BUILDINGS | ANKARA-2005 | YAPIMARKET |
| Drainage System Installation |
|
|
| TAI DETAIL DYING BUILDING 20B | ANKARA-2005 | YÖNDEM KLİMA |
| HVAC, Process lines, Drainage, potable water lines, Fire suppression installation |
|
|
| PEACE EAGLE SUPPORT CENTER | KONYA-2005 | ARI OTOMASYON |
| FM 200 Fire Suppression with Gaseous FM200 and Detection System Installation |
|
|
| EFES PİLSEN BİRA FABRİKASI | AFYON-2005 | EMO MÜHENDİSLİK |
| Fire cabinets, Hydrants, Pumping House, wet alarm valves, internal piping |
|
|
| AKBANK Regional Management Building | TRABZON-2005 | ORUÇOĞLU-AKA İNŞAAT |
| Mechanical Consultancy |
|
|
| İŞ BANKASI SUBURCU BRANCH | GAZİANTEP-2005 | ORUÇOĞLU-AKA İNŞAAT |
| Mechanical Consultancy |
|
|
| Demetevler Building Project | ANKARA-2005 | KORAY YAPI END |
| Commisioning, Tests, putting into operation |
|
|
| İTU ARI TEKNOKENT A - B - C BloCKS ( 25.000 m² ) | İSTANBUL-2004 | AGE İNŞAAT |
| Design and installation of Central Heating, HVAC Equipments, Fire Suppression system, piping, commissioning, putting into operation |
|
|
| ÜMİTKÖY YUVAMIZ SİTE | ANKARA-2004 |
|
| Heating and potable water design, installation, renovation, piping and putting into operation. |
|
|
| SİRENA GOLF HOTEL | Belek/ANTALYA-2004 |
|
| 8 Kitchens's Fire Suppression system installation, piping and testing |
|
|
| MAN A.Ş. MESS ROOMs and Kitchen | ANKARA-2004 | ARTİT A.Ş. |
| Central heating, Heating lines, HVAC installation of 5 Mess room for 3000 people(3.600 m²) and testing |
|
|
| ÇAĞDAŞ ART CENTER | ANKARA-2004 | PEM MİMARLIK |
| Drainage System installation, Testing |
|
|
| MAN A.Ş. PAint warehouse | ANKARA-2004 | EMO MUH. |
| Fire detection and fire suppression systems with gaseous |
|
|
| MAN A.Ş. TRUCK CHASSIS OVEN | ANKARA-2004 | EMO MUH. |
| Fire detection and fire suppression systems with gaseous |
|
|
| MAN A.Ş. UBS ROOMS | ANKARA-2004 | EMO MUH. |
| Fire detection and fire suppression systems with gaseous |
|
|
| ÇUMRA Sugar Plant | KONYA-2004 | EMO MUH. |
| Fire Cabinets, hydrants, Pumping station, internal piping, wet alarm valves, Foaming monitoring |
|
|
| BETEK Paint Plant | GEBZE - 2003 |
|
| Fire suppression system with foaming and water and testing ( 103.000 m² open area + 40.000 m² building ) |
|
|
| TUBİTAK MAM A - B - C - D - E Block and mess rooms | GEBZE - 2003 | AGE İNŞAAT |
| (15.000 m²) Central Heating design and installation, HVAC, potable water lines, fire suppression, piping and testing |
|
|
| DİKMEN NATIONAL SECURITY BUILDING | ANKARA-2002 |
|
| IT Centre fire suppression system wit gaseous |
|
|
| 4. Army corps KOLAYLIK facilities | ANKARA-2002 | AKAY İNŞAAT |
| Kitchen, Laundry, and bathrooms (126 showers) potable water design, Steam line equipment installation and piping and testing |
|
|
| Military Jurisdiction Court ‘s ARCHIVES | ANKARA-2002 | KİBAROĞLU İNŞAAT |
| 5 archives Fire Suppression System with gaseous installation and testing |
|
|
| GAZI University Culture Centre | ANKARA-2002 | TEPE PROJE |
| Kitchen potable water piping, Heating installation, kitchen ventilation and ducts installation and testing |
|
|
| GAZI University Culture Centre | ANKARA-2002 | TEPE PROJE |
| Rehabilitation of Ball Hall ventilation and cooling system, commissioning, putting into operation, testing |
|
|
| OYAK RENAULT AUTOMOBILE PLANT P3 BUILDING DYING HOUSE | BURSA - 2002 |
|
| Fire Suppression System, piping, installation and testing. |
|
|
| AIR FORCES SOCIAL FACILITITES | ANKARA-2002 | ATLANT CONS. |
| Design water potable water, heating boiler, fan-coil equipment, heating system with radiator, piping, installation and testing |
|
|
| HİLTON HOTEL | ANKARA-2002 | EMO MÜHENDİSLİK |
| Kitchen Fire Suppression System, Main kitchen, Breakfast kitchen, pastry kitchen, Banquet kitchen, and service kitchen Ventilation, Fire suppression system, installation and testing. |
|
|
| ÇAMLIK BUILDINGS | ANKARA-2002 |
|
| Rehabilitation of Heating system and lines, and potable water line and infrastructure. |
|
|
| ÜMITKÖY YUVAMIZ BUILDINGS | ANKARA-2002 |
|
| Changing of Heating Boilers, rehabilitation of heating system infrastructure and piping, installation and testing |
|
|
| ARMADA Business Center Adidas | ANKARA-2002 | FS Construction Co. |
| Fire Suppression System Piping Installation and testing. |
|
|
| BETEK PAINT PLANT | GEBZE - 2002 |
|
| Fire Lines, Fire Suppression System with foaming and water, installation and testing. |
|
|
| ALMER (KAYSERI HILTON OTEL) | KAYSERİ-2002 |
|
| Main Kitchen, Turkish Cuisine, Breakfast Kitchen, Night restaurant's kitchen, personnel kitchen, Fire suppression system underneath ventilation, piping, installation and testing. |
|
|
| BOR leather industrial zone | NİĞDE - 2002 | NİĞBAŞ Consultancy |
| Feasibility of conversion and application |
|
|
| NİĞBAŞ Concrete Plant | NİĞDE - 2002 | NİĞBAŞ Consultancy |
| Plant and Blocks heating project revision, Central Heating application, supply of hot water with 50 pcs. Solar collector. |
|
|
| ESENBOĞA Airport Simulator training centre | ANKARA-2001 |
|
| Fire suppression system with gaseous |
|
|
| S.S. FINAL BUILDINGS | ANKARA-2001 |
|
| Complete mechanical works ( Heating, potable water, waste water, fire suppression installation) |
|
|
| G.Ü. ECONOMY Faculty Conference Hall and cinema | ANKARA-2001 | TEPE PROJE |
| Complete mechanical works ( Heating, potable water, waste water, fire suppression installation) |
|
|
| 100. YIL ÜN. CHEMICAL And Biology Labs | VAN - 2001 | TEPE PROJE |
| 81 Labs LPG, Water, and waste water line resistant to acids. |
|
|
| KAYSERI 2. HIBM Commands No 1 plane maintenance hangar | KAYSERİ - 2001 | ALP İNŞAAT |
| Fire Detection, warning and suppression system |
|
|
| TURMOB General Management Center | ANKARA-2001 | TEPE PROJE |
| 3 floor Heating, cooling and ventilation installation |
|
|
| G.Ü. Medicine Faculty Conference Hall | ANKARA-2001 | TEPE PROJE |
| Heating, Air conditioning and ventilation system. |
|
|
| EURO-Asia Satellite Monitoring Station | ANKARA-2001 |
|
| IT Fire Protection System with gaseous |
|
|
| BEYTEPE, A COTTAGE | ANKARA-2001 |
|
| Heating, Potable water, Waste water, Insulation, wet floor applications |
|
|
| AKSARAY National Security Palace | İSTANBUL-2001 |
|
| IT Fire Suppression System wit gaseous |
|
|
| DATA SISTEM ( ARMADA ) | ANKARA-2001 |
|
| Showroom and offices heating system |
|
|
| AKSAN PLASTIK | G.ANTEP-2001 |
|
| INK warehouse fire protection system with gaseous Consultancy and material supply |
|
|
| VAN 100. YIL university | VAN-2001 |
|
| WC, Ventilations, design, consultancy and material supply |
|
|
| DMO General Management | ANKARA-2001 |
|
| Heating system of entrance hall with decorative works |
|
|
| NAKSAN PLASTIK | G.ANTEP-2001 |
|
| Paint Warehouse fire suppression system with gaseous consultancy and material supply |